Innovative Solutions, Proven Results
Our portfolio showcases a diverse range of successfully completed projects across various industries. Each endeavor reflects a commitment to innovation, quality, and client satisfaction. From groundbreaking initiatives to transformative solutions, our work demonstrates the ability to tackle complex challenges and deliver exceptional results. Strong partnerships with clients are at the heart of our approach, as we collaborate closely to bring their visions to life. Explore our featured projects to see how ideas are transformed into reality, driving success and making a meaningful impact in every endeavor.
Duration: 60 months.
Provision of Repair Services for AG Storage Tanks
Duration: 60 months.
Supply of Safety Officers
Duration: 2 months.
Repair of Gas Gathering Pipelines between CS4 & CS5
Duration: 36 months.
Term Contract for Cleaning & Waste Disposal Services
Duration: 4 months.
Construction of New Floating Roof for Oil Storage Tank No. 1401 (140' dia)
Duration: 36 months.
Major Maintenance of Internal & External Tanks (13Nos)
Duration: 36 months.
Emergency Repair Services Contract
Duration: 60 months.
Provision of Crane, Forklift and Rigging Hire Services
Duration: 18 months.
Major Internal Maintenance of Water Storage Tanks (6 tanks)
Duration: 4 months.
Internal Maintainance of Electricity & Water Authority Surge Vessel
Duration: 8 months.
Replacement of UG_OWS System at CGP-I (Phase-V)
Duration: 14 months.
Removal of AB Pipelines (Auction)
Duration: 36 months.
Provision of Manpower & Machinery Term Contract
Duration: 120 months.
Sulphur Handling for Haulage and Ship Loading
Duration: 2 months.
Miss Mechanical Works at Sitra Storage
Duration: 2 months.
T&I Shutdown of CGP-II
Duration: 3 months.
Construction of New Floating Roof for Oil Storage Tank No. 115 (120' dia)
Duration: 1 month.
CO2 Recovery Plant Shutdown Works
Duration: 2 months.
T&I Shutdown for CGP Amine
Duration: 60 months.
Heavy Transport and Driver Hire Services
Duration: 6 months.
Major Internal Maintenance of Water Storage Tanks (2 tanks)
Duration: 2 months.
Replacement of FW Sprinkler Header for Sphere
Duration: 1 month.
Draining & Water Washing of Jet Fuel from Arad Depot
Duration: 60 months.
Vaccum Tanker Services
Duration: 2 months.
T&I Shutdown for Naphtha Storage Tank (3 tanks)
Duration: 9 months.
Major Internal Maintenance of Water Storage Tanks (3 tanks)
Duration: 2 months.
Hot Tapping Works
Duration: 2 months.
Provision of Jump Over for Propane RunDown Lines
Duration: 1 month.
Supply of Manpower & Machinery for FCCU Shutdown
Duration: 30 months.
Replacement of Asphalt Pump & Piping at Asphalt Loading Plant
Duration: 24 months.
Term Contract for Supply of Manpower & Machinery
Duration: 6 months.
Fabrication of Auxiliary Piping Supports for BMP Project (40,000 kg)
Duration: 2 months.
Replacement of Vapor Return Line at Sitra Storage
Duration: 16 months.
Provision of Jump Over to Residue Gas Common Header
Duration: 72 months.
Heavy Equipment & Assoc Rigging Services
Duration: 60 months.
Crane Hire Services upto 350 to 500 Tons
Duration: 1 month.
Major External Maintenance of Elevated Storage Reservoir Tank (ESR) at Hidd BS
Duration: 24 months.
8&24inch Jet Fuel Pipeline for Bahrain International Airport
Duration: 2 months.
T&I Shutdown works for CGP-I
Duration: 2 months.
Miss Mechanical Works at CGP-I
Duration: 12 months.
Re-Route Condensate Lines to the New Sump Pit at ADP
Duration: 3 months.
Structural Modification in #1HCU Pipe Rack
Duration: 102 months.
Tank Mechanical Repair Services
Duration: 12 months.
Major Internal Maintenance of Water Storage Tanks (6 tanks)
Duration: 60 months.
Transport Equipment & Driver Hire Services
Duration: 12 months.
Upgrade Motor M3577 in Sitra Tanks
Duration: 2 months.
T&I Shutdown works for CGP-II
Duration: 3 months.
Demolition of Asphalt Tanks No. 162 & 163 and Fire water Tank No. 89 (10m dia x 10m Ht)
Duration: 60 months.
Mechanical Services for Wharf Structure & Pipeline Repair
Duration: 60 months.
Heavy Equipment & Assoc Rigging Services
Duration: 6 months.
Reroute Drain Line for Strainers 91V724, 91V725 and 91V726 (GRE Pipeline)
Duration: 2 months.
Miscellaneous Mechanical Works at Different Locations of Company Facilities
Duration: 12 months.
Supply of Heavy Equipments
Duration: 60 months.
Provision of Crane Hire Services
Duration: 60 months.
Misc Mechanical Repair Services
Duration: 1 month.
Desludging of Refinery Oil Separators Nos. 4, 5 & 6
Duration: 1 month.
T&I Shutdown works for CGP-I and CGP-II
Duration: 60 months.
Heavy Equipment & Associated Rigging Services
Duration: 12 months.
Installation of an 18/16-inch stainless-steel pipeline (1 kilometer) and associated equipment for a CO₂ recovery plant.
Duration: 12 months.
Bulk Diesel Top Loading Project (BDTL)
Duration: 12 months.
Repair and Maintenance of Oil Storage Tanks (144 ft & 120 ft)
Duration: 8 months.
Tie-Ins and Associated Works at Well Manifolds and Compressor Stations
Duration: 6 months.
De-Sludge and Clean Skim Pond (capacity of Contain 18, 000 cubic meters)
Duration: 60 months.
Bulk Asphalt Haulage Services
Duration: 6 monnths.
Expansion of the Fuel Hydrant Pipelines at Bahrain International Airport (Appx. 1 km)
Duration: 8 months.
Installation of Wellhead Facilities, Offsite Piping and Pipelines for GDU K38 and KW 868
Duration: 20 monnths.
Refinery Gas Desulphurisation Project (RGDP)
Duration: 60 monnths.
Provision of Riggers for Rigging Services
Duration: 60 months.
Provision of Riggers for Rigging Services